看天堂-看特级毛片-看特级大黄一片-看全色黄一级毛片-看全色黄大色黄女视频-看全色黄大色黄大片视频

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
News
Hot products

Service Hotline

0755-29727486 0755-83734215 0755-83734236
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2098

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: [email protected]

Business section #605

Email: [email protected]

Website: www.65874.cn

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
主站蜘蛛池模板: 桃色综合网 | 日韩免费高清专区 | 麻豆亚洲一区 | 亚洲男人的天堂网站 | 国产综合亚洲专区在线 | 欧美亚洲国产精品久久久 | 久久亚洲一级α片 | 1769最新资源站 | 2018av在线| 爱情岛论坛亚洲永久入口口 | 亚洲娇小videos | 精品视频在线播放 | 狠狠婷婷综合缴情亚洲 | 国产色司机在线视频免费观看 | 亚洲www美色| 丝瓜茄子绿巨人秋葵榴莲污 | 亚洲欧美久久久久久久久久爽网站 | 日本免费全黄一级裸片视频 | 热巴在公交车h文 | 免费观看的毛片 | 日韩精品一区二区三区中文字幕 | 奇米影视先锋 | 国产老村长足疗店对白 | 久久99影院 | 日本高清中文 | 国产自拍视频一区 | 乌克兰肥熟 | 亚洲丰满模特裸做爰 | 亚洲欧美日韩另类在线 | 国内精品91久久久久 | 日韩一级生活片 | 边摸边吃奶又黄激烈视频韩国 | 日本一区二区三区精品 | 初尝黑人巨大h文 | 精品一区二区三区自拍图片区 | 呜嗯啊野战h呻吟男男双性 污小说在线阅读 | 交换性关系中文字幕6 | 九九九久久久 | 亚洲 欧美 成人 | 大桥未久一区二区 | 国产麻豆精品原创 |